Kusum Solar Pump Scheme 2025: Complete Guide - Benefits, Eligibility, Subsidy & Application Process
Introduction to Kusum Solar Pump Scheme 2025
The Kisan Urja Suraksha evam Utthaan Mahabhiyan (KUSUM) Scheme, launched by the Ministry of New and Renewable Energy (MNRE), is a transformative initiative to promote solar-powered irrigation and reduce farmers' dependence on costly diesel and electric pumps.
The 2025 edition of the scheme introduces higher subsidies, expanded coverage, and streamlined processes, making it more accessible to farmers across India. This guide covers every detail—from eligibility to application—ensuring you can maximize benefits under this scheme.
![]() |
Kusum Solar Pump Scheme 2025 |
Key Objectives of Kusum Solar Pump Scheme 2025
- ✅ Reduce farmers' electricity bills by replacing diesel/electric pumps with solar pumps
- ✅ Promote renewable energy in agriculture
- ✅ Enhance energy security in rural areas
- ✅ Provide extra income by allowing farmers to sell surplus solar power to the grid
- ✅ Support sustainable farming with eco-friendly irrigation solutions
Key Features & Updates in Kusum Solar Pump Scheme 2025
Feature | Details |
---|---|
Subsidy | Up to 90% subsidy for standalone solar pumps (varies by state) |
Pump Capacity | 1HP to 10HP (flexible options for different farm sizes) |
Grid-Connected Pumps | Farmers can sell excess power to DISCOMs |
Target Capacity | 10,000 MW solar power capacity for farmers |
Priority Beneficiaries | Small & marginal farmers, SC/ST applicants |
Loan Assistance | Low-interest loans available through NABARD & banks |
![]() |
KUSUM Yojana |
Eligibility Criteria for Kusum Solar Pump Scheme 2025
Who Can Apply?
- ✔ Indian farmers with agricultural land
- ✔ Small & marginal farmers (priority given)
- ✔ Farmers without existing grid-connected pumps (in some states)
- ✔ Cooperative societies & farmer groups (eligible for larger systems)
Required Documents
- Aadhaar Card (linked with mobile number)
- Land ownership proof (7/12 extract, Khatauni, etc.)
- Bank account details (for subsidy transfer)
- Caste certificate (if applying under SC/ST quota)
- Passport-size photograph
Types of Solar Pumps Covered Under Kusum Scheme
1. Standalone Solar Pumps (Off-Grid)
- No grid connection required
- Best for remote areas with unreliable electricity
- Subsidy: Up to 90% (varies by state)
2. Grid-Connected Solar Pumps
- Excess power can be sold to DISCOMs
- Net metering benefits
- Subsidy: Up to 60%
3. Solarization of Existing Pumps
- Convert diesel/electric pumps to solar
- Subsidy: Up to 50%
![]() |
solar pump subsidy |
Subsidy Structure Under Kusum Solar Pump Scheme 2025
Pump Capacity | Central Subsidy | State Subsidy | Farmer's Contribution |
---|---|---|---|
Up to 3HP | 30% | 30% | 40% |
Above 3HP | 30% | 30% | 40% |
SC/ST Farmers | Additional 5-10% subsidy in some states |
📌 Example: A 5HP solar pump costs ₹3 lakhs → Farmer pays only ₹1.2 lakhs (after 60% subsidy).
Step-by-Step Application Process (Online & Offline)
Option 1: Online Application
- Visit Official Portal: https://mnre.gov.in/kusum
- Register: Use Aadhaar-linked mobile number
- Fill Form: Enter land, pump capacity & bank details
- Upload Documents: Aadhaar, land papers, bank passbook
- Submit & Track: Note application number for status updates
Option 2: Offline Application
- Visit Nearest Office: Agriculture Dept./DISCOM office
- Collect Form: Fill & submit with documents
- Verification: Officials inspect land & approve application
- Installation: Selected vendor installs the pump
⏳ Processing Time: 4-8 weeks
Benefits of Kusum Solar Pump Scheme 2025
- 🌞 Cost Savings: No electricity/diesel costs
- 💧 24/7 Irrigation: No power cuts or fuel shortages
- 💰 Extra Income: Sell surplus solar power to DISCOMs
- 🌱 Eco-Friendly: Reduces carbon footprint
- 🏆 Govt. Support: High subsidies & loan facilities
State-Wise Subsidy Variations
State | Subsidy for 3HP Pump | Additional Benefits |
---|---|---|
Rajasthan | 90% | Extra 5% for SC/ST |
Uttar Pradesh | 80% | Low-interest loans |
Maharashtra | 85% | Priority for drought-prone areas |
Punjab | 75% | Free maintenance for 5 years |
📢 Check your state's agriculture department website for exact rates.
Loan Facilities Under Kusum Scheme
- NABARD & nationalized banks offer loans at 4-6% interest
- Repayment period: Up to 10 years
- No collateral for loans up to ₹1.5 lakhs
![]() |
Kusum Scheme online apply |
Frequently Asked Questions (FAQs)
Q1. Can a tenant farmer apply for the Kusum Solar Pump Scheme?
✅ Yes, if they have a 10-year lease agreement.
Q2. How much does a 5HP solar pump cost after subsidy?
💰 Approx. ₹1.2 lakhs (after 60% subsidy).
Q3. Can I get a free solar pump under Kusum Scheme?
❌ No, but subsidies reduce cost by up to 90%.
Q4. How long does installation take?
⏳ 4-8 weeks after approval.
Q5. Is maintenance covered under the scheme?
🔧 Some states offer free maintenance for 3-5 years.
Conclusion: Why Apply for Kusum Solar Pump Scheme 2025?
The Kusum Solar Pump Scheme 2025 is a golden opportunity for farmers to cut costs, boost productivity, and adopt green energy. With high subsidies, easy loans, and long-term benefits, this scheme is a game-changer for Indian agriculture.
📢 Don't miss out! Apply now and secure your solar pump at minimal cost.